Mfg. due date
This is the due date for this manufacturing process. (If there are multiple manufacturing processes registered, this will be the due date for the final manufacturing process) This date will be used as the date on which the manufactured items will be added to the available stock. In the same way this date will be treated as the date on which child items needed are to be used from their stock.
All Screens with this Parameter.
Category | Screen | Section | Tab | Input Method | Mandatory |
---|---|---|---|---|---|
Production Mgt. | Internal Manufacturing Order | New/Modify (Header) | (None) | Dropdown List | Optional |