Safety lead time

日本語

This is the number of days set as a margin between the date on which this item is to be manufactured and the date on which this item is planed to be used. For example, if 1 is set for this parameter, the order will be placed in the way so that the item will be ready for shipment one day before the required due date.

All Screens with this Parameter.

Category Screen Section Tab Input Method Mandatory
Master Tables Item Master New/Modify (Detail) MRP Calculation Integer Value Input Optional