Qty. of in/out

日本語

This is the total quantity registered in both the Goods Received Entry and the Goods Shipped Entry. This quantity does not include the quantity at the supplier location. The quantity shown in the first line is the total quantity received and shipped during the period between the previous inventory date to the day before the begging of the specified period.

All Screens with this Parameter.

Category Screen Section Tab Input Method Mandatory
Production Mgt. MRP Calculation - Result Analysis List Screen (None) Display Only Optional

ページの先頭へ戻る