External (Ext. mfg. order sheet)
By enabling this box and click on the execute MRP calculation Button, the external manufacturing order entry will be made based on the MRP calculation result.
All Screens with this Parameter.
Category | Screen | Section | Tab | Input Method | Mandatory |
---|---|---|---|---|---|
Production Mgt. | MRP Calculation | Screen Header | (None) | Check Box | Optional |